Most recently collected
-
Call for External Collaborator – Preparation of Project Concept Notes and Intervention Models Linking just transition and other workstreams, CO Jakarta Open in a new window
ILO · Indonesia · closes 18 Oct 2026 · rfx_12188_ROAP
Shown in the language the agency published it in.
-
Expert for AIS Fund Facility Institutional and Resource Mobilization Strategy Open in a new window
UNDP · Indonesia · closes 23 Oct 2026 · UNDP-IDN-00935
Shown in the language the agency published it in.
-
Transportation Project Management and Monitoring Evaluation Specialist for Component 2 GEF Indonesia SCIP
Directorate of Transportation, Ministry of National Development Planning/Bappenas · Indonesia · closes 14 Oct 2026 · ID-TRANSPORT - BAPPENAS-556265-CS-INDV
Shown in the language the agency published it in.
-
Agricultural Support package marine aquaculture materials to 12 Vulnerable Communities in Kampot, Kep, and Preah Sihanouk Provinces
Agency not stated · Cambodia · MAFF-G-54
Shown in the language the agency published it in.
-
Expert for AIS Fund Facility Institutional and Resource Mobilization Strategy
UNDP-IDN/INDONESIA · Indonesia · closes 23 Oct 2026 · UNDP-IDN-00935
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF KUMBANG PASANG DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/110
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF ASSARRA DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/108
Shown in the language the agency published it in.
-
(196) EPU/MAKMAL/26-27 PROVISION OF ISO/IEC 17025:2017 SURVEILLANCE AUDIT AND LOGISTICS ARRANGEMENT FOR WATER SERVICES LABORATORY, DEPARTMENT OF WATER SERVICES (FSR), 2026
Public Works Department (JKR), Brunei · Brunei · (196) EPU/MAKMAL/26-27 (REQUOTE)
Shown in the language the agency published it in.
-
(272) EPU/BARUN/26-27 SUPPLY, DELIVER AND INSTALL ACTUATOR CURRENT POSITION TRANSMITTERS AND LEVEL SENSOR AT BINUTAM DAM
Public Works Department (JKR), Brunei · Brunei · (272) EPU/BARUN/26-27
Shown in the language the agency published it in.
-
MAINTENANCE OF IOT WATER LEVEL FOR 12 MONTHS. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/099
Shown in the language the agency published it in.
-
SUPPLY AND DELIVERY OF SUBMERSIBLE SEWAGE PUMPS AND REINFORCED FLEXIBLE HOSES TO PWD SEWERAGE STORE, GADONG. Closing Date : 26/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/116
Shown in the language the agency published it in.
-
SEARCH, LOCATE, TRACE AND VERIFY EXISTING ELECTRICAL SUPPLY TO SEWERAGE PUMPING STATION, MUA SPS 7. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/102
Shown in the language the agency published it in.
-
PENAMBAHBAIKAN RANGKAIAN SISTEM PAIP AIR UTAMA DAN TANGKI-TANGKI AIR BAGI SEMUA DAERAH : PAIP AIR UTAMA INLET KE TANGKI UTAMA MELABAU, DAERAH BRUNEI DAN MUARA CLOSING DATE : 03/11/2026 @ 2.00PM
Public Works Department (JKR), Brunei · Brunei · JKR/DWS/016/2026
Shown in the language the agency published it in.
-
PROPOSED PIPE REPLACEMENT OF 100MM DIA. TO 150MM DIA. DUCTILE IRON PIPE AT SPS MEN-1C, RPN MENTIRI. Closing Date : 26/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/117
Shown in the language the agency published it in.
-
PEMBINAAN SUMP TANK DAN BOOSTER PUMP UNTUK DI KG. MATA-MATA, KG. JANGSAK, KG. BEBULOH, KG. MASIN DAN KG. SUBOK CLOSING DATE : 03/11/2026 @ 2.00 PM
Public Works Department (JKR), Brunei · Brunei · JKR/DWS/024/2026
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF MENGLAIT DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/111
Shown in the language the agency published it in.
-
TWELVE (12) MONTHS CONTRACT FOR BREAKDOWN MAINTENANCE OF PS1-PS4 (KG UKONG, KG RAMBAI DAN KG PANCHONG) – (2026/27) Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/107
Shown in the language the agency published it in.
-
SIX (6) MONTHS CONTRACT FOR BREAKDOWN MAINTENANCE OF PS1-PS8 (KG LUBOK PULAU, KG TANJONG MAYA, SG SEBAKIT/LEBAYAS, KG PENAPAR) – (2026/27) Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/109
Shown in the language the agency published it in.
-
(282) EPU/SUPPLY/TRANS/26-27 RECTIFICATION, CONSTRUCTION OF PIPELINE SUPPORTS, DRAINAGE IMPROVEMENT AND PROTECTIVE COATING WORKS TO EXISTING TRANSMISSION PIPELINE AT KM 105, LEBUHRAYA MUARA-TUTONG
Public Works Department (JKR), Brunei · Brunei · (282) EPU/SUPPLY/TRANS/26-27
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF BURONG PINGAI DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/112
Shown in the language the agency published it in.