tenders.watch

Most recently collected

  1. EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF KUMBANG PASANG DRAINAGE PUMPING STATION. Closing Date : 19/10/2026

    Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/110

    Shown in the language the agency published it in.

  2. EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF ASSARRA DRAINAGE PUMPING STATION. Closing Date : 19/10/2026

    Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/108

    Shown in the language the agency published it in.

  3. SUPPLY AND DELIVERY OF SUBMERSIBLE SEWAGE PUMPS AND REINFORCED FLEXIBLE HOSES TO PWD SEWERAGE STORE, GADONG. Closing Date : 26/10/2026

    Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/116

    Shown in the language the agency published it in.

  4. SEARCH, LOCATE, TRACE AND VERIFY EXISTING ELECTRICAL SUPPLY TO SEWERAGE PUMPING STATION, MUA SPS 7. Closing Date : 19/10/2026

    Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/102

    Shown in the language the agency published it in.

  5. PENAMBAHBAIKAN RANGKAIAN SISTEM PAIP AIR UTAMA DAN TANGKI-TANGKI AIR BAGI SEMUA DAERAH : PAIP AIR UTAMA INLET KE TANGKI UTAMA MELABAU, DAERAH BRUNEI DAN MUARA CLOSING DATE : 03/11/2026 @ 2.00PM

    Public Works Department (JKR), Brunei · Brunei · JKR/DWS/016/2026

    Shown in the language the agency published it in.

  6. EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF MENGLAIT DRAINAGE PUMPING STATION. Closing Date : 19/10/2026

    Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/111

    Shown in the language the agency published it in.

  7. (282) EPU/SUPPLY/TRANS/26-27 RECTIFICATION, CONSTRUCTION OF PIPELINE SUPPORTS, DRAINAGE IMPROVEMENT AND PROTECTIVE COATING WORKS TO EXISTING TRANSMISSION PIPELINE AT KM 105, LEBUHRAYA MUARA-TUTONG

    Public Works Department (JKR), Brunei · Brunei · (282) EPU/SUPPLY/TRANS/26-27

    Shown in the language the agency published it in.

  8. EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF BURONG PINGAI DRAINAGE PUMPING STATION. Closing Date : 19/10/2026

    Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/112

    Shown in the language the agency published it in.

  9. KERJA-KERJA PENGUBAHSUAIAN SISTEM UNDERDRAIN PENAPIS DI LOJI RAWATAN AIR BUKIT BARUN PERINGKAT 4 TUTONG, JABATAN PERKHIDMATAN AIR CLOSING DATE : 03/11/2026 @ 2.00 PM

    Public Works Department (JKR), Brunei · Brunei · JKR/DWS/026/2026

    Shown in the language the agency published it in.

  10. Notice (No. 1843 PC A.K) on the Works of Driving Foundation Piles (0.3m x 0.3m x 8m) to Construct the Retaining Fence Wall at the Canal Culvert Bank, at Ou Trech Electricity Substation (GS64)

    Électricité du Cambodge · Cambodia · closes 15 Jun 2026

  11. Notice No. 400 on the construction of a new 3m x 4m guard post at Oudum Electricity Substation (GS10) and the construction of a new 85m road at Pailin Electricity Substation (GS67), addressed to the Electricity Transmission Department (2nd time)

    Électricité du Cambodge · Cambodia · closes 21 Feb 2024

  12. សេចក្តីជូនដំណឹង (លេខ: ២៣៤១ PC.អក) ស្តីពី ការងារសាងសង់ផ្លូវបេតុងដែក ទំហំ 5,080m² ទីធ្លាទំហំ 25m x 35m និងកាណាល់បង្ហូរទឹក ប្រវែង 80m នៅឃ្លាំងអគ្គិសនីវត្តស្លែង

    Électricité du Cambodge · Cambodia · closes 24 Sep 2024

    Shown in the language the agency published it in.

  13. សេចក្តីជូនដំណឹង ស្តីពី (លេខ ២១៣៨ PC អ.ក) ការអញ្ជើញចូលរួមដេញថ្លៃការងារចាក់់បេតុងដែកផ្លូវកម្រាស់ 0.15m ទំហំ 970m², ចាក់បេតុងដែកទីធ្លាកម្រាស់ 0.1m ទំហំ 200m², ធ្វើស្លាកសញ្ញាឡូហ្គោ និងក្រាលការ៉ូឡាចិញ្ចើមផ្លូវ នៅសាខាកំពង់ត្រាច សាងសង់របងមានជន្ទល់បង់បាញ់ ប្រវែង 290m ទីតាំងដីសម្រាប់ដាក់បង្គោលភ្លើង ជូនអគ្គិសនីកំពត

    Électricité du Cambodge · Cambodia · closes 20 Aug 2025

    Shown in the language the agency published it in.

  14. Notice (No. 167) on the Supply of Materials and Labor Services for the Extension of the New MV Overhead Distribution Network, 01 Feeder, along National Road No. 44 in Kampong Speu Province

    Électricité du Cambodge · Cambodia · closes 23 Feb 2023

  15. សេចក្តីជូនដំណឹង ស្តីពី (លេខ ២២៣០ PC អ.ក) ការងារវាយកំទិចថ្មរបងចាស់ប្រវែង 102m, សាងសង់ទ្វារចូល និងរបងខាងមុខ កម្ពស់ 2.5m, ប្រវែង 47.5m, និងរៀបខឿនអមសងខាងផ្លូវប្រវែង 400m នៅអនុស្ថានីយអគ្គិសនីកំពង់ស្ពឺ (GS13), ការងារសាងសង់ប៉ុស្តិ៍យាមទំហំ (3 x 4)m នៅអនុស្ថានីយអគ្គិសនីកំពង់ស្ពឺ (GS13) អនុស្ថានីយអគ្គិសនីពោធិ៍ចិនតុង (GS53) និងអនុស្ថានីយអគ្គិសនីអូរសោម (GS22), ការងារសាងសង់របងបេតុងដែក កម្រាស់ 0.20m កម្ពស់ 0.80

    Électricité du Cambodge · Cambodia · closes 1 Sep 2025

    Shown in the language the agency published it in.

  16. សេចក្តីជូនដំណឹង (លេខ: ១១១០ PC អក) ស្តីពីការងារចាក់ដីបន្ថែមជើងទេរផ្លូវបេតុងចូល ចំនួន 14 កន្លែងប្រវែងសរុប ចំនួន 314m នៅអនុស្ថានីយអគ្គិសនីមុខកំពូល (GS59) ជូននាយកដ្ឋានបញ្ជូនអគ្គិសនី(ក្រៅផែនការឆ្នាំ)

    Électricité du Cambodge · Cambodia · closes 12 May 2025

    Shown in the language the agency published it in.

  17. សេចក្តីជូនដំណឹង ស្តីពី (លេខ ២៣៩១ PC អ.ក) ការងារចាក់ដី ធ្វើរបង និងរៀបចំប្រព័ន្ធលូ នៅលើក្បាលដីលេខ ៣៨០ ជូនសាខាអូរដឹម នៃនាយកដ្ឋានអាជីវកម្មចែកចាយ

    Électricité du Cambodge · Cambodia · closes 8 Sep 2025

    Shown in the language the agency published it in.

  18. Notice No. 182 on the construction of a new 3m x 4m guard post at Ou Dem Substation (GS10) and the construction of a new 85m road at Pailin Substation (GS67), addressed to the Transmission Department of Electricity

    Électricité du Cambodge · Cambodia · closes 5 Feb 2024

  19. សេចក្តីជូនដំណឹង (លេខ: ១៣៨២ PC អក) (លើកទី២) ស្តីពី ការងារចាក់ដីបន្ថែមជើងទេរផ្លូវបេតុងចុល ចំនួន 14 កន្លែង ប្រវែងសរុប ចំនួន 314m នៅអនុស្ថានីយអគ្គិសនីមុខកំពូល (GS59) ជូននាយកដ្ឋានបញ្ជូនអគ្គិសនី (ក្រៅផែនការឆ្នាំ)

    Électricité du Cambodge · Cambodia · closes 2 Jun 2025

    Shown in the language the agency published it in.

  20. Notice on (No. 1650 PC A.K.) Invitation to Bid for Concrete Pouring Works for Roads and Yards, 0.15m thickness, area 398.7m2, and Sand Pouring, area 36.8m2, at Lumphat Electricity Branch; Reinforced Concrete Road Pouring, 1.15m thickness, area 1,049.5m2, and Concrete Pouring for the Front Yard of the Warehouse, 0.15m thickness, area 795m2, at the New Ratanakiri Electricity Site.

    Électricité du Cambodge · Cambodia · closes 15 Jun 2026