Closed
Water
INSTALLATION OF WATER SYSTEM AT PUROK-2
Shown in the language the agency published it in. No English translation is available.
- Agency
- BARANGAY SUMILIHON, BUTUAN CITY
- Market
- Philippines
- Reference
- 2026003
- Category
- Well Drilling and Construction Services
- Published
- 5 Oct 2026
- Closes
- 13 Oct 2026, 01:00 add to calendar
- Estimated value
- PHP 220,000.00
Description
SPL-1 Drilling and Installation of Casing Pipe 0.46 L.M. 0.75 SPL-2 Installation of Electric Pump 0.35 set 0.06 901(1) Concrete (for Manual Mixing) 0.11 m³ 0.10 903 (2) Formworks 0.07 m² 1.00
Source
Collected from philgeps. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 13 hours ago. When this source last ran.